Monday, 17 December 2012


Buzi Access Check

16 Dec 12 - Minimum Flow

Checked out access and egress options.

Chipinge commercial farmer Brendon S kindly drove with me down to the Buzi to check out access and egress options.  According to Brendon and other locals, the best time for flowing water will be March.

The challenge was to find access to the best part of the river, from approximately  20°19'26.78"S, 32°49'40.39"E to approximately 20°26'50.72"S, 32°51'30.61"E.  The complication is the international border, which means we can't start at the South Downs Bridge (20°17'29.31"S, 32°48'18.76"E).

I'm happy to report that we've managed to work out a simple way to make it all work.  So it's all set for a new river to be explored!

No comments:

Post a Comment